N
Naz
If no supllier cut off is available, what are the safe methods of isolation prior to changing out the CU?
1. Get supplier to install a cut off switch (could take 3 mnths) or
2. Pull 100A fuse and say security tag was already cut? Regs state work to be done on isolated circuit.
regards
Naz
1. Get supplier to install a cut off switch (could take 3 mnths) or
2. Pull 100A fuse and say security tag was already cut? Regs state work to be done on isolated circuit.
regards
Naz