In my view there really wasn’t anything wrong with the regulations before part P was introduced I don’t think there is that much wrong with 99% of the equipment we fit ! But what I do think is making a big difference is the amount of foreign workers here now that still carry out work the way they did in their home country and people being rushed through short courses and worst of all people rushing their work to try and cram in that extra job for an extra £ and not taking their time to do it right !
At the end of the day the reason for all this happening is down to our government running our country down for UK residents and allowing people to come here to work without first checking they have the qualifications to do so ! While if a company doesn’t give a job to a percentage of immigrants you are accused of racial discrimination! I am not saying we don’t have our own cowboys here or that all immigrants are cowboys but I am positive it has an impact ! I mean have you seen some of the wiring abroad ?
 
It could also be a case of lingering faults that haven't manifested their true destructive potential.

I was finishing at the house that tried to kill me today (as a side note, turns out I didn't need to go in the loft I fell out of as I fixed the lighting fault I was investigating from a ceiling rose which has been wired totally wrong, bloomin' typical right :) ).

When I conducted my Ze test (issuing an EIC for the rewire of the ring final circuit), the test probe moved the screw securing the conductor of the line meter tail in the main isolator. Got many turns on it before it was nice and tight.

So just by sheer luck it hadn't caused a problem. Who knows how much longer it would have been before that luck ran out.
 
One of the problems with foreign workers doing work to their country’s codes or regulations, is if they are from an EU country, their work will comply with Part P.
 
One of the problems with foreign workers doing work to their country’s codes or regulations, is if they are from an EU country, their work will comply with Part P.
I think you may want to change that to should comply to part P I was at a job recently where they had been adding insulation to a house as a result they has stepped the wall out 6 inches their spark had connected the ring behind the wall in 15A strip connectors and wrapped them with tape adding two short lengths of 2.5 to extend the ring in to the back boxes ! This was done to 6 double sockets along two outside walls which were stripped back to the stone before being clad again ! Why didn’t they renew the cables at this point ! Answer because it would have taken longer and they only get paid so much per job and this was being carried out as part of a government scheme ! So I stand by my words !!
 
In 2012 the DCLG Introduced a new recording system for fire services called the IRS, this was a more detailed version of previous recording with many drop down menu's, including 'Electrical supply' so this has undoubtedly caused a sharp increase in the figures.
 
I think you may want to change that to should comply to part P I was at a job recently where they had been adding insulation to a house as a result they has stepped the wall out 6 inches their spark had connected the ring behind the wall in 15A strip connectors and wrapped them with tape adding two short lengths of 2.5 to extend the ring in to the back boxes ! This was done to 6 double sockets along two outside walls which were stripped back to the stone before being clad again ! Why didn’t they renew the cables at this point ! Answer because it would have taken longer and they only get paid so much per job and this was being carried out as part of a government scheme ! So I stand by my words !!
Well, if their country’s code or regulations allow for what you describe, then legally it will comply with Part P.
 
In 2012 the DCLG Introduced a new recording system for fire services called the IRS, this was a more detailed version of previous recording with many drop down menu's, including 'Electrical supply' so this has undoubtedly caused a sharp increase in the figures.

That seems to answer the sharp increase in the statistic for 2012 onwards.
 
Well, if their country’s code or regulations allow for what you describe, then legally it will comply with Part P.


I wasn’t aware of that fact so I thank you.
But like sparkychick I find it unbelievable.
That basically means anyone checking work done here would need to know the rules in every EU country , where as I understood the EU brought everyone under the same rules regardless of which EU country you come from !
But that does explain the amusement on the face of a German friend I have when he visits and sees the palava we have with health and safety here compared to Germany !
 
The LFB fire stats are IMO an anomally look at the stats for every other fire brigade in the country over the same period and a totally different picture emerges while the LFB stats showed a massive increase the rest of the country's brigades figures remained fairly constant and in some cases showed a slight reduction
 
The LFB fire stats are IMO an anomally look at the stats for every other fire brigade in the country over the same period and a totally different picture emerges while the LFB stats showed a massive increase the rest of the country's brigades figures remained fairly constant and in some cases showed a slight reduction
But London is the be all and end all of the UK...
 
Slightly off subject, but the article on cut-out fires interested me. How many people, qualified or otherwise apply for load approval from their dno if they intend installing extra load, such as a shower or storage heaters? In this area there are still quite a few metal clad cut-out with 30amp rewireable fuses. When we get a no supply on one of these, first question is "who was in the shower"? Even on a cut out with cartridge fuses, they will take quite an overload for some time, getting rather hot, and eventually failing. It's a regular thing to find the fuse welded in because it's been so hot. Main problem with cu's is as others have said, only one terminal screw and they need checking, and checking again, especially if the tails have been moved. I always did so if meter tails had been moved and 9 times out of 10 they needed tightening.
 

Reply to consumer unit fires. in the Security Alarms, Door Entry and CCTV (Public) area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
271
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
767
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
774

Similar threads

  • Question
Yep, that’s what I do. That spare RCD has always come in handy down the line.
2
Replies
24
Views
2K
HI, I'm a director of a freehold building which is 4 stories (one flat per storey), with a basement flat with its own separate entrance down...
Replies
0
Views
207

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top