O
OtleySpark
If I were to undertake a job that involved say changing a CU what sort of costs would be entailed (other than my labour and parts) ?
There is the Local Authority Notification that seems to be fixed ÂŁ58.75 < ÂŁ1000, etc.
What about the Certificates?
If the distributor does not have a switch do they charge todisconnect and reconnect - I assume they'd send someone out to do this?
Just trying to get a handle on the overheads.
Thanks.
There is the Local Authority Notification that seems to be fixed ÂŁ58.75 < ÂŁ1000, etc.
What about the Certificates?
If the distributor does not have a switch do they charge todisconnect and reconnect - I assume they'd send someone out to do this?
Just trying to get a handle on the overheads.
Thanks.