Anyone got any examples of a critical path network for building construction, electrical work and commissioning, getting to that point in a unit of going down the pub and getting lashed. I am meant to be on a dry month to lose some weight! What is the point of this? If I say I refuse to answer as it is a pointless exercise and a waste of two hours of my life do you think I would still get a pass? Rant over!