G
gooner85
Hi guys, just a quick one.
If you have a TNCS system, then the main earth is 16mm
Instead of going to a CU it goes to a 60A switch fuse. from the switch fuse to the consumer you would use 16mm cable.
My question is would you still need to have a 16mm earth going through the switch fuse to the CU.
It would seem to me that you could go from the MET in 16mm and then it could be reduced to the CPC with the 16mm cable.
Thanks in advance
If you have a TNCS system, then the main earth is 16mm
Instead of going to a CU it goes to a 60A switch fuse. from the switch fuse to the consumer you would use 16mm cable.
My question is would you still need to have a 16mm earth going through the switch fuse to the CU.
It would seem to me that you could go from the MET in 16mm and then it could be reduced to the CPC with the 16mm cable.
Thanks in advance