P
Phasor
Hi All, I am looking for some guidance on the following.
I look after a facility and it has an energy meter on the Main Distribution Board. This meter has a set of Cts feeding into it.
My question is, can i piggy back of this energy meter or Cts so that i can have 2 meters fed of the same CT.
It is a long story as to why i need 2 meters basically showing the same info from the MDB.
Hope someone can help. looking forward to your responses.
Regards
Danny
I look after a facility and it has an energy meter on the Main Distribution Board. This meter has a set of Cts feeding into it.
My question is, can i piggy back of this energy meter or Cts so that i can have 2 meters fed of the same CT.
It is a long story as to why i need 2 meters basically showing the same info from the MDB.
Hope someone can help. looking forward to your responses.
Regards
Danny