Customers, you've got to love them. | on ElectriciansForums

Discuss Customers, you've got to love them. in the UK Electrical Forum area at ElectriciansForums.net

GBDamo

-
Arms
Joined
Jun 22, 2016
Messages
1,911
Reaction score
3,414
Location
UK
Carrying out an EICR.

Turned all lights on and went to the DB to isolate before checking R2 using R1+R2, linked at the DB and testing at all pionts.

First point; 200+MOhms, second; the same. Randomly test another five points, all +200MOhms.

Marked down the fault, no CPC continuity on lighting circuit before noticing the light switch was off?

Checked all the others and they're all off, the old geezer had followed me round turning the lights off.

:mad: :mad: :mad: :mad:
 
Carrying out an EICR.

Turned all lights on and went to the DB to isolate before checking R2 using R1+R2, linked at the DB and testing at all pionts.

First point; 200+MOhms, second; the same. Randomly test another five points, all +200MOhms.

Marked down the fault, no CPC continuity on lighting circuit before noticing the light switch was off?

Checked all the others and they're all off, the old geezer had followed me round turning the lights off.

:mad: :mad: :mad: :mad:
Did you explain what you were doing and why? remember Old folk are wary of strangers give em some respect.
 
I'll bet he's an old spark who was taking the pi$$.....watching you test continuity with an insulation resistance test (M ohms) :), ;),
even if it was clear.
Good spot, very long week.
[automerge]1584734040[/automerge]
Did you explain what you were doing and why? remember Old folk are wary of strangers give em some respect.
In all fairness Pete I was instructed by the landlord to carry out an EICR not educate his tannant.

That said a little friendliness and communication with the occupant not only stops them dicking you about but also keeps you in coffee.

We got the coffee, so not all bad.
 
Enjoying my last few working years on metering the usual customer question is “How long will the power be off.” My response is always “around 30-40 minutes but the good news is we don’t charge you for it while it’s off and if you want to put the kettle on before it does please do it now” This usually produces a wry smile and a cup of tea.
 

Reply to Customers, you've got to love them. in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
381
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
961
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

Hello Ric2013, MJPD29 and westward 10. I have a multimeter that I tested the voltage with and before I open the socket up I use a plug in tester...
Replies
4
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top