Hi all
I am doing a commercial install, rewiring a village hall, in this hall we have 2 x rings, 4 x lighting circuits, 1 x immersion heater, then it is 6 x convector heaters and 4 x infra red heaters. All heaters are on their own radial circuit and are to be controlled 2 x timer switches via contactors, my query is the distribution boards.
It is a 3 phase supply so i was wondering what is best as all circuits are single phase, 1- putting in 3 x 10 way db's with RCD main switches this seperating circuits onto different RCD's and putting the 2 contactors inside the board or 2- 1 x 3 phase board with RCBO's on all circuits, obviously trying to keep costs down but do you guys prefer any of the options above or do you have any better ideas.
Many thanks
I am doing a commercial install, rewiring a village hall, in this hall we have 2 x rings, 4 x lighting circuits, 1 x immersion heater, then it is 6 x convector heaters and 4 x infra red heaters. All heaters are on their own radial circuit and are to be controlled 2 x timer switches via contactors, my query is the distribution boards.
It is a 3 phase supply so i was wondering what is best as all circuits are single phase, 1- putting in 3 x 10 way db's with RCD main switches this seperating circuits onto different RCD's and putting the 2 contactors inside the board or 2- 1 x 3 phase board with RCBO's on all circuits, obviously trying to keep costs down but do you guys prefer any of the options above or do you have any better ideas.
Many thanks