Mfctitch
-
Morning Nearly said lads then thought better of it so morning everyone.
I've got to price for another shed job, I know you're thinking "so"
But question, as we have established with my previous threads I tend to go over board but this time I need some advice on diversity
For a change I know that there will be
at least
2 number 3Kw panel heaters
A radial circuit
A lighting circuit
A 10.5 Kw shower
This gives me 38.5 Kw over a 44 metre distance with at least 2 metres going under ground.
so I need to bring that figure down, I've watched the john Ward clip on cookers but can I use more diversity on the other circuits. I happy for you to point me in the right direction in the book if that would help.
One other question there anyway round the this calculation on going underground as the cable is only under the ground for two metres but it makes a big difference
Thanks
I've got to price for another shed job, I know you're thinking "so"
But question, as we have established with my previous threads I tend to go over board but this time I need some advice on diversity
For a change I know that there will be
at least
2 number 3Kw panel heaters
A radial circuit
A lighting circuit
A 10.5 Kw shower
This gives me 38.5 Kw over a 44 metre distance with at least 2 metres going under ground.
so I need to bring that figure down, I've watched the john Ward clip on cookers but can I use more diversity on the other circuits. I happy for you to point me in the right direction in the book if that would help.
One other question there anyway round the this calculation on going underground as the cable is only under the ground for two metres but it makes a big difference
Thanks