Hi,
A full rewire of a house was quoted and 4m of red and black was used of a ring to supply kitchen and garage. I’ve been told that the cable was tested with a 1000v insulation measurement meter and a decision was made to utilise the cable to make it compline with the 19th.
Is this all okay? It feels odd that they didn’t just replace the cable!
Thanks!