sptrotter67
Hi
I currently work for a renewable energy company and am being messed around by one DNO in particular. We have installed a 4KWp(DC) system which includes 18 pv modules and one inverter rated at 3.6KWp (AC) and is G83/1 certified . The DNO is saying that the system is G59 due to the modules being 4KWp. My argument is that the installation is a 3.6KWp system therefore falls under G83/1. The system is MCS certified and commissioned as a 3.6KW system. Who is correct??? Other DNO's accept the inverter size as any changes shall be informed to the DNO, ie if someone replaced the inverter for a larger one then it should be reassessed under mcs... anyone any ideas as i believe they are incorrect to force me down the G59 route.
regards
trotts
I currently work for a renewable energy company and am being messed around by one DNO in particular. We have installed a 4KWp(DC) system which includes 18 pv modules and one inverter rated at 3.6KWp (AC) and is G83/1 certified . The DNO is saying that the system is G59 due to the modules being 4KWp. My argument is that the installation is a 3.6KWp system therefore falls under G83/1. The system is MCS certified and commissioned as a 3.6KW system. Who is correct??? Other DNO's accept the inverter size as any changes shall be informed to the DNO, ie if someone replaced the inverter for a larger one then it should be reassessed under mcs... anyone any ideas as i believe they are incorrect to force me down the G59 route.
regards
trotts