Hi All,
I need to change a DB in a block of flats in central London (W2 postcode), where EDF can't give a date for at least 6 weeks to come and isolate the supply, but at the same time won't / can't give out a date after this, which makes no sense to me!
This is both options of just popping around and isolating until work is done or installing a smart meter with DP switchgear!
The supply is a standard 1361 Type II fuse, and i'm not too keen on cutting the tags!
Does anyone have alternative methods of isolating the supply so as to change the DB? Also what is the average cost nowadays for this?
TIA
I need to change a DB in a block of flats in central London (W2 postcode), where EDF can't give a date for at least 6 weeks to come and isolate the supply, but at the same time won't / can't give out a date after this, which makes no sense to me!
This is both options of just popping around and isolating until work is done or installing a smart meter with DP switchgear!
The supply is a standard 1361 Type II fuse, and i'm not too keen on cutting the tags!
Does anyone have alternative methods of isolating the supply so as to change the DB? Also what is the average cost nowadays for this?
TIA