Easy enough and possibly very silly question. when moving a supply, if there are 2 sets of 25mm tails in the meter box (one to the CU for the house, second set to a 63A switch fuse supplying an annexe, will the DNO terminate both sets happily enough?
Thanks,
Easy enough and possibly very silly question. when moving a supply, if there are 2 sets of 25mm tails in the meter box (one to the CU for the house, second set to a 63A switch fuse supplying an annexe, will the DNO terminate both sets happily enough?