Hi All
I'm a little unsure if i need to test all circuits in a consumer unit if i have added a new circuit into it. The circuit added is a ring final and has been installed in a spare way on the board, also one of the lighting circuits has now had a single pendent changed to 6x downlights. Do i just need to test these 2 circuits (along with bonding and Ze) and complete an new install cert or do i need to test all the other circuits as well. Any guidance/advise greatly appreciated
I'm a little unsure if i need to test all circuits in a consumer unit if i have added a new circuit into it. The circuit added is a ring final and has been installed in a spare way on the board, also one of the lighting circuits has now had a single pendent changed to 6x downlights. Do i just need to test these 2 circuits (along with bonding and Ze) and complete an new install cert or do i need to test all the other circuits as well. Any guidance/advise greatly appreciated