G
gibbyisking
been ask to change a fuseboard. the fuseboard is supplying 5 storage heater circuits each on a 20A breaker. It is on the off peak supply. Plan is to put a 8way 80A 30ma RCD unit. Now is this ok or does the fuseboard have to have a main switch?