All of which proves if you get two reports on the same installation by two different electricians one might be a satisfactory.....and one an unsatisfactory.
Dont inspire confidence does it?
Absence of supplementary bonding where required, such as in a location containing abath or shower, where any of the following three conditions are not satisfied: All final circuits of the location comply withthe requirements of Regulation 411.3.2 forautomatic disconnection, and All final circuits of the location haveadditional protection by means of a 30 mARCD, and All extraneous-conductive-parts of thelocation are effectively connected to theprotective equipotential bonding (mainearthing terminal).
Just out of interest then if you carried out an EICR to a site that was installed to the 17th addition and there was now RCD protection for circuits in a bathroom /shower room would it be a code 2 or 3
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc