Got a call the other day. Electrician in hospital. No power. Please help.
He was working on a 8 way 3 phase board and attempted to insert a single phase MCB without turning off the power first (trying to be helpful). Unfortunately he mispositioned the MCB and managed to short 2 phases with the securing screw. The resulting arc destroyed all the MCBs on that side and all of the busbar MCB tags bar one (11 of them) before blowing a 200 Amp supply fuse. The electrician suffered severe burns to his arms. His eyes were saved by his glasses.
Lesson learnt, I hope!
Pete
Got a call the other day. Electrician in hospital. No power. Please help.
He was working on a 8 way 3 phase board and attempted to insert a single phase MCB without turning off the power first (trying to be helpful). Unfortunately he mispositioned the MCB and managed to short 2 phases with the securing screw. The resulting arc destroyed all the MCBs on that side and all of the busbar MCB tags bar one (11 of them) before blowing a 200 Amp supply fuse. The electrician suffered severe burns to his arms. His eyes were saved by his glasses.
Lesson learnt, I hope!
Pete