downlights | on ElectriciansForums

Discuss downlights in the UK Electrical Forum area at ElectriciansForums.net

i=p/u

-
Arms
Joined
Dec 9, 2010
Messages
7,520
Reaction score
816
Location
Northern Ireland
morning.

i have a house coming up with 20 odd down lights in kitchen. but when i look at ceiling joists i can see the room goes in a angle and joist go at an angle too.

so i know im going to hit the joists left right and centre and know wont be allowed to cut joists to accomadate down lights.. few tips or tricks in how talking customer round or what you would do in situations like this, thanks if you been there many times and wanna share..
 
use one of them stud/metal detectors. map out the run of the joists and plan your positions accordingly. if you make a boob and hit a joist, glue the cut-out back in with some filler.
 
Or once you've drilled a 4mm hole use a bit of 1.5 with a right angle bend in it, insert through hole and see if you can rotate it through 360 degrees
cheapskate, i use 2,5mm.
 
How are you going to connectthe lights to each other? At some point you need to get the cabling through a joist or two whichever way they run, so whether it's floorboards above or ceiling below, you've got to open up something. Then you'll find where the joists are and you won't have to rely on guesswork or nail holes. Or have I missed the announcement about wireless downlighters?

pj
 
Cheaper still, I use old wire coathangers bent to the radius of my cutout!

As has been said above, mark out the run of the joists and position your downlights accordingly.

Regards

where do you get your coathangers calibrated. ?
 
hahahah you nutters or am i plank.. i can see the joists but they aint gonna go where they are in drawing..... no chance.

so what do you do? do you just leave out downlight where a joist is instead.. does it end up looking bad 3 lights one line four the next
 
you space them out according to the joists. if the drawing has been done by a designer, then get him back to modify it. explain why. it's called passing the buck and covering your arse.
 
you space them out according to the joists. if the drawing has been done by a designer, then get him back to modify it. explain why. it's called passing the buck and covering your arse.
Or get the designer to come in and prove himself by cutting the holes, he may think twice about designing **** poor stuff in the future...
 

Reply to downlights in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
275
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
773
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
779

Similar threads

  • Question
I have to agree with Baldelectrician on almost everything he says except one ! I wouldn’t be walking away I’d be running lol. Definitely if your...
Replies
13
Views
2K
SOLVED Thanks for all the help. It was nothing to do with the smoke detector. In this new hole (where there will be a light fitting) three white...
    • Like
2
Replies
24
Views
3K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top