D
Deleted member 113322
As part of a current project I am looking to install uplights in the ground at the end of the drive which I believe are also known as Drive over lights or Walk over lights. S
crewfix and Toolstation sell them and one I have purchased to look at is from Screwfix (5548T) which is a GU10 Enlite fitting.
Now this fitting has a flex coming out of it with about half a metre on it which isnt going to go far. In fact it isnt going to allow me to wire from one light to another.
I have read online there are Gel based junction boxes to water proof this and also a mix of stories as to whether or not I have to use armoured cable or not.
Can any of you guys give any advice on how i can go about putting 3-4 uplights in at the end of the drive. the whole drive will be tarmac and block paved border so there will be no flower beds, etc.. to hide any junction boxes in there?
Some other thoughts:
1. Do I have to work with armoured cable? If not whats the alternative?
2. Whats the depths I have to put it in at when they dig the drive up?
3. Whats the rules on the junction boxes in the drive?
4. what tricks/tips on what i can use to over come regulation problems, etc..)
(FYI.... I have rewired many houses but never done any outside work before)
crewfix and Toolstation sell them and one I have purchased to look at is from Screwfix (5548T) which is a GU10 Enlite fitting.
Now this fitting has a flex coming out of it with about half a metre on it which isnt going to go far. In fact it isnt going to allow me to wire from one light to another.
I have read online there are Gel based junction boxes to water proof this and also a mix of stories as to whether or not I have to use armoured cable or not.
Can any of you guys give any advice on how i can go about putting 3-4 uplights in at the end of the drive. the whole drive will be tarmac and block paved border so there will be no flower beds, etc.. to hide any junction boxes in there?
Some other thoughts:
1. Do I have to work with armoured cable? If not whats the alternative?
2. Whats the depths I have to put it in at when they dig the drive up?
3. Whats the rules on the junction boxes in the drive?
4. what tricks/tips on what i can use to over come regulation problems, etc..)
(FYI.... I have rewired many houses but never done any outside work before)