Hi, we're a 14 unit strata in BC. New regulations call for us to have An ‘Electrical Planning Report' done by the end of 2026". It apparently is to give a factual basis to proceed with EV charging infrastructure installations.
My concern is that our electrical shed is in poor condition, and certainly not up to code, fiber optic cable installers apparently characterised it as a disaster several years ago.
Will the qualified professional who must be retained to write the report flag the building as a hazard, and if that's done what would happen next?
My concern is that our electrical shed is in poor condition, and certainly not up to code, fiber optic cable installers apparently characterised it as a disaster several years ago.
Will the qualified professional who must be retained to write the report flag the building as a hazard, and if that's done what would happen next?
Last edited by a moderator: