Yes, I know its a much discussed issue, but I would be obliged if someone could explain to me why a copper water pipe entering the building which has a metal stopcock fitted 2 inches above the floor level which is located under the kickboard of a kitchen unit with the outgoing pipework in plastic have to be bonded. I know because the regulations say that it must but what the rationale behind it ?