Sorry E54 - couldn't resist!
So... need to put some temporary rods in for temp supplies, unexpectedly, in a hurry. Wholesaler only has 1 x 5/8ths and 2 3/8ths, OK says me that'll have to do.
RCD protected supplies and no bonding, so arguably they don't even need to be there at all (TNCS available), and it's just for a week to run 110V gear so 'I'm not overly bothered about the finer points'.
Can't bang them fully down either as there's all sorts underground in the area where they can only sensibly be put. So each is down roughly 3' a piece, into the same turned over, rubble mess of what's passing for soil now. The two 3/8ths are about a meter apart and the 5/8 is about five metres up the way and slightly deeper in.
Ze's were 172, 6 and 2 ohms. Which was which??
So... need to put some temporary rods in for temp supplies, unexpectedly, in a hurry. Wholesaler only has 1 x 5/8ths and 2 3/8ths, OK says me that'll have to do.
RCD protected supplies and no bonding, so arguably they don't even need to be there at all (TNCS available), and it's just for a week to run 110V gear so 'I'm not overly bothered about the finer points'.
Can't bang them fully down either as there's all sorts underground in the area where they can only sensibly be put. So each is down roughly 3' a piece, into the same turned over, rubble mess of what's passing for soil now. The two 3/8ths are about a meter apart and the 5/8 is about five metres up the way and slightly deeper in.
Ze's were 172, 6 and 2 ohms. Which was which??