Lc1

-
Joined
Apr 25, 2015
Messages
115
Reaction score
19
Location
Anywhere
With regards to electrical continuity across pipe flanges to bs 7671 I cannot find anything on how to size flat braided cable. Could someone point me in the right direction please is there a rule of thumb with regards to bolt size? Thanks
 
With regards to electrical continuity across pipe flanges to bs 7671 I cannot find anything on how to size flat braided cable. Could someone point me in the right direction please is there a rule of thumb with regards to bolt size? Thanks
Why would you want to? don't the big bolts form a good enough connection? done any testing.
 
I think the site has a belts and braces approach. From what I have seen the straps are different across flanges of the same size. Can’t see anything in bs7671 with regards to sizing them?

Thanks
 
For what purpose is the pipe being made electrically continuous? WIMES spec, extraneous parts or just because?
 
I’ve had my head in my hands tying to convince a project engineer that using braided straps across flanges is pointless when it’s full of M20 bolts

Measure the strap with a vernier calliper to get the csa. Or ask the manufacturer.
 
I think the site has a belts and braces approach. From what I have seen the straps are different across flanges of the same size. Can’t see anything in bs7671 with regards to sizing them?

Thanks
 
I worked for many years on chemical plants and bonding across flanges was very randomly (to the uninitiated) applied.

I think its all down to the level of experience of the comical (chemical) engineers.

Straight out of uni = bond everything that doesnt move.

Experienced = bond across non-conductive components. Primarily driven by testing then by knowledge and experience.

Quite often it was the pipe that required bonding between the flanges.

Sometimes it was the flanges but to stop them accumulating a charge.

These kind of decisions should be led by an engineer rather than a spark, they have more knowledge of the material being transferred and the materials of construction of the pipework, it could be lined with plastic or glass.
 
I dont think BS7671 will be of any use as this "bonding" is often not forming part of the electrical installation, albeit connected to earth terminals that do form part of the electrical installation, they are there to stop accumulation of static at insulated points within the pipework.

These have been known to discharge and ignite flammable vapours.
 
What's crazy about it is if the flange bolts are being used to hold the strap then unless the bolts are removed and the flange cleaned up the contact area will be no better with or without the strap.

Best of luck undoing the flange bolts if the pipe has water in it, get some waterproofs.
And if it's a new installation don't let the Pipefitter see you removing the bolts or you'll be removing 1 or more of them from somewhere quite painfull.
 
This is certainly a "why and how" question,for the site engineer.
The circumstances,area and contents of the pipe,may negate the removal of even one bolt,from a sealed flange,and the person responsible for OKing such a move,is the one to explain the reasons for bonding.

I have had this very situation,at a large,Cheshire based refinery,where one of the off-hand,dismissive statements from a post-graduate assistant,to the missing engineer,suggested "if you're that concerned about the integrity of the flange bolts,then just stud-weld a stud,on each face,and strap between them..."

One of the old school plant supervisors,present during this escapade,turned his head towards the young gent,and asked "A stud-welder,son? ... do you know what's in that pipe?..." :cool::cool::cool:
 
“Hot-Bolting” is a very common practice in the oil industry, prior to a shutdown or pipe changeout. Basically the pipe fitter will change every bolt in a flange, one by one until they are all swapped out for new. It means that come the shutdown they can change the spool or gasket etc quickly without having to worry about seized bolts. I had guys who spent many days doing this offshore!

To go back to the OP, an easy solution would be to just throw in a serrated washer between the nut and flange on each side of one of the threaded studs. Actually a useful method to ground Motors on skids, rigs or ships when the contractor has forgotten to run an earth cable.

The only reason I can see for bonding them is to prevent static build up where Highly flammable chemicals are used, but mostly if the chemicals are really explosive 5he pipes will be fully welded rather than flanged.but if it’s water - why bother.

I will add that my current employer has procedures that actually allow for welding on live crude lines (must be pressurized and with a certain minimum level of flow) - got to love the Middle East!
 

Reply to Earthing across flanges in the Talk Electrician area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
388
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
969
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

Indeed it would be. But that would mean having 2 things to disconnect instead of one. More margin for error. Of course, any diligent spark would...
Replies
6
Views
668
loz2754
L
Other way round, all line conductors are live conductors, but not all live conductors are line conductors. A live conductor is any conductor...
Replies
2
Views
67
davesparks
D

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top