S
StokieSpark
Okay, been working at a factory today and need to establish the earthing arrangement of it..
The power comes from a substation which has an earth electrode, then after the transformer the cables come into the factory with the earthing conductor..
Am i right in saying the installation is a TT? as it has an electrode in the substation....
The power comes from a substation which has an earth electrode, then after the transformer the cables come into the factory with the earthing conductor..
Am i right in saying the installation is a TT? as it has an electrode in the substation....