Hi there, im looking some general advice related to this eicr.
im a bit lossed here, so would it be 2 eicr?
or do i just splice two sheets together with the relevant information?
on a seperate not i also noticed today when i had a wee look that his main water bond cannot be verified, is this a dealbreaker?
i mean i see a group of 6mm earths leaving the board(with no other purpose) but theres nothing at the stop cock.
It a block of flats (circa 1970)
Any advice would be greatly appreciated and also if anyone could recommend a specific course that teaches all the in/outs of eicr?
would it be 2391?
I mean your tradesman shows you testing and you get it at college and then you pass the test etc but no one really goes into detail and tells you how to deal with eicr(s) etc
im a bit lossed here, so would it be 2 eicr?
or do i just splice two sheets together with the relevant information?
on a seperate not i also noticed today when i had a wee look that his main water bond cannot be verified, is this a dealbreaker?
i mean i see a group of 6mm earths leaving the board(with no other purpose) but theres nothing at the stop cock.
It a block of flats (circa 1970)
Any advice would be greatly appreciated and also if anyone could recommend a specific course that teaches all the in/outs of eicr?
would it be 2391?
I mean your tradesman shows you testing and you get it at college and then you pass the test etc but no one really goes into detail and tells you how to deal with eicr(s) etc