Octopus
Tails out going are supplied by the contractor. But they are connected.!Look at least 10mm maybe 16mm my eyes aint good.
So its OK to snip the meter seals to fit them?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss EICR meter tails coding in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net
Tails out going are supplied by the contractor. But they are connected.!Look at least 10mm maybe 16mm my eyes aint good.
Crack on if you want. If it bugged me.?So its OK to snip the meter seals to fit them?
Thanks guys for all your replies, my bad they were 10mm after i checked,
I'm still pretty new to doing ECIR's so don't be to hard on me, iv yet to come across tails that small in my journeys.
the installation has already failed on numerous faults,
sorry i should of said unsatisfactory.An EICR is satisfactory or unsatisfactory - there is no pass or fail!
Can you give us some examples?
C1'S then. = unsatisfactory.(2)as well. code 3 is not.sorry i should of said unsatisfactory.
there is no bonding to the gas
there is non ip rated light within zone 2
same light is also broken with access to live parts,
No blanks within CCU,
there is numerous C3's
Reply to EICR meter tails coding in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net