Straightforward EICR job coming up on my village church. Don’t think it’s ever had one before.
Quick visual survey today to estimate my time, and instant thoughts are no RCDs anywhere, cables clipped surface here, there and everywhere and joint boxes hidden behind wood panelling. (I should know that one by now)
Anyway… having a good look around, up old balcony’s that no one uses now, accessed from doors outside… I came across this….
I never even knew that was there!
Some other points of interest:
Heating board. Single insulated cables running from Henley into CU
No busbar shield. And very limited space to put in a full RCBO board.
Hidden JB
Nicely clipped lead cables (unused) versus newer PVC just thrown in.
Quick visual survey today to estimate my time, and instant thoughts are no RCDs anywhere, cables clipped surface here, there and everywhere and joint boxes hidden behind wood panelling. (I should know that one by now)
Anyway… having a good look around, up old balcony’s that no one uses now, accessed from doors outside… I came across this….
I never even knew that was there!
Some other points of interest:
Heating board. Single insulated cables running from Henley into CU
No busbar shield. And very limited space to put in a full RCBO board.
Hidden JB
Nicely clipped lead cables (unused) versus newer PVC just thrown in.