I'm not sure it is clearer. I was confident that I produced a very detailed PIR report complete with photos, additional comments (like emergency lighting, fire detection), drawings of the building with all inspected items higlighted with r2 values. I would explain the issues and a covering letter with the minimum for what needed to be carried out with associated costs. The new EICR had added more of the pages that people simply skip over as they dont understand them. there are some 120 items to inspect and note which is ridiculous. i feel that they are penalising those that carried out PIR well and produced good repoprting techniques and have introduced a new tick list for those that didnt, so to force them into taking note. Well, i feel people will just ignore them and falsify the coding.
And yes Jase, my report is at 13 pages without the individual comments!