Hi, I am doing course on electrical engineering. I have an electrical schematic. The scheme uses 1000kva transformer, 500kva back-up gen, 2nr 160kva ups (parallel operation).
I have 3 questions:
1. The schematic shows a main 800A fuse and a separate neutral 400A fuse, why cant the fuse 800A switch all phases and neutral together e.g 4pole?
2. The fuses I refer to in 1 above are in the switchpanel, should there be a fuse at the beginning of the incoming cable (cable from the transformer) to protect the cable?
3. In books 3 switches are shown for the wrap-around bypass, why can’t 2 switches be used.
I would very much appreciate answers in layman terms as I have only just started the course.
I have 3 questions:
1. The schematic shows a main 800A fuse and a separate neutral 400A fuse, why cant the fuse 800A switch all phases and neutral together e.g 4pole?
2. The fuses I refer to in 1 above are in the switchpanel, should there be a fuse at the beginning of the incoming cable (cable from the transformer) to protect the cable?
3. In books 3 switches are shown for the wrap-around bypass, why can’t 2 switches be used.
I would very much appreciate answers in layman terms as I have only just started the course.