Hi Guys,
I would like to know that, if I have a generating facility, at how many kwh output would it changes from requiring a normal Low voltage system to requiring a High voltage system.
I am initially trying to avoid the High mega buck cost of upgrading the electricity network to a HV system.
Thank you
I would like to know that, if I have a generating facility, at how many kwh output would it changes from requiring a normal Low voltage system to requiring a High voltage system.
I am initially trying to avoid the High mega buck cost of upgrading the electricity network to a HV system.
Thank you