Hi all
can anyone tell me of there experience of fitting gear inside a dno meterbox....?
ie a switch fuse for submain..
or switch fuse as required if your tails or submain to your consumer unit is more than 3m away from the cutout..?
im aware that the dno's regs may say i cant fit gear in their box....but ive also been told to do so on occasion by them..
im not aware of any reg as per bs 7671 amd3 that requires me not to do so....
but id love to hear all your thoughts on this......well almost all...you know what i mean.
ta
vito
can anyone tell me of there experience of fitting gear inside a dno meterbox....?
ie a switch fuse for submain..
or switch fuse as required if your tails or submain to your consumer unit is more than 3m away from the cutout..?
im aware that the dno's regs may say i cant fit gear in their box....but ive also been told to do so on occasion by them..
im not aware of any reg as per bs 7671 amd3 that requires me not to do so....
but id love to hear all your thoughts on this......well almost all...you know what i mean.
ta
vito