stuartsjg
Hello,
The normal PME etc query i see on the forum relates to the farm buildings supplied from the house where the house runs on PME and the farm on TT with local earth rods.
In this case, the supply is terminated to the the farm which has a PME supply, should the farm CU & final loads be connected as a TT system and run the house from a PME for which i would run in a 2C+E.
Are there then not issues with having the farm house (which is about 3m from the buildings) on a different earth system to the farm? Would it be best to run the whole site as TT?
Any advice would be good.
Thanks,
Stuart
The normal PME etc query i see on the forum relates to the farm buildings supplied from the house where the house runs on PME and the farm on TT with local earth rods.
In this case, the supply is terminated to the the farm which has a PME supply, should the farm CU & final loads be connected as a TT system and run the house from a PME for which i would run in a 2C+E.
Are there then not issues with having the farm house (which is about 3m from the buildings) on a different earth system to the farm? Would it be best to run the whole site as TT?
Any advice would be good.
Thanks,
Stuart