loz
-
- Joined
- Jun 4, 2011
- Messages
- 48
- Reaction score
- 20
got a few 100w floods to mount on a newbuild. The walls are clad with insulated cladding, outer tin strip, insulated ion, thin tin strip. I can't get a fixing into the top purling, due to guttering. The client wants the floods mounted between en the top 2 purlins. I was thinking 2 bits of units rut outside horizontally (to span the corrigations) bolted through into 2 more bits of strut about a foot long mounted vertically to spread the weight of the fitting? I really don't want to crease the building, or even worse have a light come down in windy conditions