R
rs250250
Hi All,
I am a qualified electrician, and I have been asked if I would be interested in wiring a chateau in France. Reading other posts, I now know that
The French version of the IEE (CEE) wiring regulations which correspond to the UK regs is NFC15-100 for BT.
What is the process for actually getting the work signed off? Would a UK sparky be able to get work signed off?
Think I will need to brush up on my Francais!
Many Thanks
I am a qualified electrician, and I have been asked if I would be interested in wiring a chateau in France. Reading other posts, I now know that
The French version of the IEE (CEE) wiring regulations which correspond to the UK regs is NFC15-100 for BT.
What is the process for actually getting the work signed off? Would a UK sparky be able to get work signed off?
Think I will need to brush up on my Francais!
Many Thanks