M
mgnelec09
Hi There,
I am currently waiting to here back from a main contractor to find out whether I have won a decent sized commercial office refurb near Liverpool.
It looks as though it is certain, and to start in about 3-4 weeks but just waiting for confirmation.
It will be some stripping out and then a full installation of distribution circuits, sockets in stud walls, cat 2 recessed lighting with klix roses, emergency lighting and fire alarm systems.
A mixture of twin and earth and Fp cabling in PVC conduits.
The job is on a tight schedule and will need to be completed in 4 weeks.
Must have own transport and experience of the above, self employed and capable to work alone or with others.
Please get back to me if interested for a chat.
Many Thanks
Steve
I am currently waiting to here back from a main contractor to find out whether I have won a decent sized commercial office refurb near Liverpool.
It looks as though it is certain, and to start in about 3-4 weeks but just waiting for confirmation.
It will be some stripping out and then a full installation of distribution circuits, sockets in stud walls, cat 2 recessed lighting with klix roses, emergency lighting and fire alarm systems.
A mixture of twin and earth and Fp cabling in PVC conduits.
The job is on a tight schedule and will need to be completed in 4 weeks.
Must have own transport and experience of the above, self employed and capable to work alone or with others.
Please get back to me if interested for a chat.
Many Thanks
Steve