What would you roughly charge for a fuse board upgrade on a 4 bed house?
Thanks
What would you roughly charge for a fuse board upgrade on a 4 bed house?
Thanks
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss Fuse board upgrade price. in the UK Electrical Forum area at ElectriciansForums.net
Basing the 3 hours on a previous reply3 hours for a CU change .................. never. I've spent 4 hours identifying all the circuits and outlets before doing anything before
I can only assume you don't test anything.
Hi,
What would you roughly charge for a fuse board upgrade on a 4 bed house?
Thanks
Minor slip or your real feelings about your clients?
That's really wrong MDJ
I don't know wether your being sarcastic or serious.I've adapted to what the market wants. I charge 250 cash for DB change now. I do them after work on way home. No cert. No worries. Customer supplies and picks up the board. I keep the old tails in as the load is same as before and saves some cash. I don't worry about bonding, but if it's there the I do terminate it most of the time. Broken rings get a 20A MCB. Low IR or circuits with earth leaky stuff goes on MCB only as I don't do call backs. I've never been so busy!!
I don't know wether your being sarcastic or serious.
I'd give a smiley face if it's sarcastic. And a dislike or even dumb if it's serious.
I don't know wether your being sarcastic or serious.
I'd give a smiley face if it's sarcastic. And a dislike or even dumb if it's serious.
Then the price of the EICR should be incorporated into the price of the cu change if i said to my customers 500 to change the board and got accepted then told them it would be an extra 200 for an EICR before I change it I’d either get kicked out or never get another CU change again if your doing an EICR every time before you change a CU that should be as part of the price for doing it.As a result of doing K&Bs for about 18 years i've changed literally hundreds of CCUs so im pretty quick at them but no i was talking about just changing a CCU, but as i would have carried out a full EICR before doing the change a retest after is not going to take long is it?
Just popped a smiley face on.Thanks for that Pete!! Lol , I'm not sure about giving you a dumb if you thought for second I was serious!