Victor
-
Aren't MCBs double pole in France?
Could this explain the price difference?
Yes they are dual pole, but when you have either a 54 or 72 way board, with 4 RCD's as well, it becomes very expensive.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss Fuse box installed for £150 what!!! in the Business Related area at ElectriciansForums.net
Aren't MCBs double pole in France?
Could this explain the price difference?
I was at one yesterday,12 way dual rcd mk .shower and cooker circuits in a dp isolator off live side!? Fed off board main switch .kitchen ring split across 2 different 6A mcbs..... On and on and on.there was no way that this had been done by a sparks.least he had fitted the stickers on the lid tho.apart from the earth neutral number sticker which was fitted on the outside of the board!
it is time that b&q et all were stopped from selling items like boards because it is inherently dangerous to be messing about with this end of any install,if u don't have a clue how it's ment to be in the first place
Bear in mind though im still not allowed to sign off testing but when i do i can't imagine charging over £100.
Jesus i charge £60 to replace a board plus the cost of the board (as long as bonding and tails don't need replaced and the board is correctly labeled). Bear in mind though im still not allowed to sign off testing but when i do i can't imagine charging over £100. This takes no more than an hour for me to do, personally i find customers grumbling at that cost too.
Jesus i charge £60 to replace a board plus the cost of the board (as long as bonding and tails don't need replaced and the board is correctly labeled). Bear in mind though im still not allowed to sign off testing but when i do i can't imagine charging over £100. This takes no more than an hour for me to do, personally i find customers grumbling at that cost too.
it takes me roughly 45 minutes to swap over and i carry out the work after a quick visual inspection and test which is about 15 mins and travel comes out my pocket.
it takes me roughly 45 minutes to swap over and i carry out the work after a quick visual inspection and test which is about 15 mins and travel comes out my pocket. in a given day i have done five or six usually this occursround about the time of b and q putting a board out at a ridiculously cheap price although the average day is 3 depending on the work i can pick up from a few guys i know.
Someones gonna see Matt Allwright one day, then some questions will be asked.So would you like to list the tests you conduct in the said 15 mins
Reply to Fuse box installed for £150 what!!! in the Business Related area at ElectriciansForums.net