Ok there is no solar within half mile, the property was originally two hence the two 200 kva supplies on site 24 k pv is a drop compared to local transformer capacity would they really need to come see
Ok there is no solar within half mile, the property was originally two hence the two 200 kva supplies on site 24 k pv is a drop compared to local transformer capacity would they really need to come see
its not what you know its who you know !
What did this whirlwind g59 witness test/ sign off consist off?
so i have every install straight delivered on time and by the book