Hi Guys,
We installed a 3.68kw Solar PV on a property in October 2012, sent off the DNO application G83 Commissioning form and all went through fine with the DNO.
Yesterday had a call from their next door neighbour which is on the same street and they want to go ahead and proceed with a 3.68kw system, now do I have to submit a single G83 commissioning form or do I have to do a prenotification G83/stage 2, Im sure i read something about a 28 day ruling but cant find anything on the DNO site.
Any advice id be really grateful, cheers in advance
Chris
We installed a 3.68kw Solar PV on a property in October 2012, sent off the DNO application G83 Commissioning form and all went through fine with the DNO.
Yesterday had a call from their next door neighbour which is on the same street and they want to go ahead and proceed with a 3.68kw system, now do I have to submit a single G83 commissioning form or do I have to do a prenotification G83/stage 2, Im sure i read something about a 28 day ruling but cant find anything on the DNO site.
Any advice id be really grateful, cheers in advance
Chris