just a quick question about galvanised trunking in a commercial setting with regards to an assaignment ive been set by my college.
i have got a run of trunking running from a plant room in a car garage which will carry pvc singles for sockets lighting etc, alongside this i have to get 4 cat 5's and 3 fp200 cables for the fire alarm system. would it be acceptable to run all of the cables through the same trunking using galvanised filleting to segregate the voltage bands and segregate the fire cables? if it is how would i go about bringing the cables over one another when they need to cross over within the trunking?
i have got a run of trunking running from a plant room in a car garage which will carry pvc singles for sockets lighting etc, alongside this i have to get 4 cat 5's and 3 fp200 cables for the fire alarm system. would it be acceptable to run all of the cables through the same trunking using galvanised filleting to segregate the voltage bands and segregate the fire cables? if it is how would i go about bringing the cables over one another when they need to cross over within the trunking?