C
craig1000
Hi in the event of it not being possible to get to the pipe of either within 300mm of it entering the building what is the course of action to take?
Exisiting install with neither bonded so it needs to be done!
I could maybe get to the gas meter box outside, is this acceptable as for the water with out further investigation i dont know what i can get to !
Also in terms of coding what would you code these as on a PIR/EICR, i am saying C2 for both, your thoughts?
May be able to get to gas via cutting up floor in living room permission given but what about then accessibility to the connections after?
What would no accessibility get coded as?
Cheers guys!
Exisiting install with neither bonded so it needs to be done!
I could maybe get to the gas meter box outside, is this acceptable as for the water with out further investigation i dont know what i can get to !
Also in terms of coding what would you code these as on a PIR/EICR, i am saying C2 for both, your thoughts?
May be able to get to gas via cutting up floor in living room permission given but what about then accessibility to the connections after?
What would no accessibility get coded as?
Cheers guys!