E
Electric Plan
PV installation done in preparation for MCS certification exam. However, FITs announcement make it pointless to continue.
Therefore, request someone to sign job off. Installation installed to high standard sharp panels 2.45 KW.
house got already NIC electrical certificate. However, require electrical sign of for array ? MCS cert.
Electrical test sheet done and tested .e.g continuity , insulation, polarity, Ze, Zs, RCD, all tests done. PV array tested insulation tests done test method 1 and 2. paperwork filled out ready;
Tester is passed as full scope, PV trained and 17th edition and was in process of registering.
Any one want to make a little cash before the industry collapses completely?:90:
Customer just needs it signed off, for a fixed fee. Get some extra money before 12/12.
Feel free to ask for photos or arrange a site visit.
Kind Regards
Thankyou
Location; Leamington Spa, Warwickshire, CV32
tele: 07525864961
Therefore, request someone to sign job off. Installation installed to high standard sharp panels 2.45 KW.
house got already NIC electrical certificate. However, require electrical sign of for array ? MCS cert.
Electrical test sheet done and tested .e.g continuity , insulation, polarity, Ze, Zs, RCD, all tests done. PV array tested insulation tests done test method 1 and 2. paperwork filled out ready;
Tester is passed as full scope, PV trained and 17th edition and was in process of registering.
Any one want to make a little cash before the industry collapses completely?:90:
Customer just needs it signed off, for a fixed fee. Get some extra money before 12/12.
Feel free to ask for photos or arrange a site visit.
Kind Regards
Thankyou
Location; Leamington Spa, Warwickshire, CV32
tele: 07525864961