Quick question, have a small caravan site to wire up.
Have 3 phase supply and TT earthing, 30ma RCD in each individual pods.
Was planning on using a 100ma type S incomer in the main DB to protect the sub feeds. ( this should stop a dodgy caravan tripping the whole site being 100ma time delay).
However not overly familiar with TT and 3 phase in terms of protecting the tails.
Ive been told by my niceic assessor with single phase and metal consumer unit, it is fine to just use the special stuffing glands.
However i dont think they make them for 3 phase?
So how would you do this?
Or would it be best to just get a seperate insulated board to house the RCD and then main switch in the DB?
Anyone any advice on this?
Have 3 phase supply and TT earthing, 30ma RCD in each individual pods.
Was planning on using a 100ma type S incomer in the main DB to protect the sub feeds. ( this should stop a dodgy caravan tripping the whole site being 100ma time delay).
However not overly familiar with TT and 3 phase in terms of protecting the tails.
Ive been told by my niceic assessor with single phase and metal consumer unit, it is fine to just use the special stuffing glands.
However i dont think they make them for 3 phase?
So how would you do this?
Or would it be best to just get a seperate insulated board to house the RCD and then main switch in the DB?
Anyone any advice on this?