tom20

Currently doing occupied property work for Camden Council at the moment and have a slight issue with Next Inspection Date and also the Extent of the work covered.

My issue is with the non-full rewires that we are doing at the moment. Where it is just a Kitchen Ring Rewire and CCU change plus a few remedials.

The Electrical division from the council are trying to get me to put 10 years for the entire property even though we have not touched the main ring nor lighting circuits. He says that if i have carried out a full test on the property and the results are good then it should be 10 years?


To solve this issue i was thinking that i could put 10 years on a non rewire to keep them happy. but put in my "extent of work" exactly what we have done and that this cert does not cover the original wiring that we have not touched.
the only problem with this is the next inspection date label on the ccu and also what sort of certification covers the rest of the property that has not been touched?

Basically trying to find what the maximum and right thing to put for a certificate where we have only rewired kitchen and ccu. In the "next inspection date" "extent of work" and Label.

thanks
tom
 
Issue an EIC for the C/U change and kitchen rewire.

Issue an EICR for the rest of the house and date it according from the results you get.
 
This is exactly what i was thinking of but possibly trying to avoid as well as maybe my company will want more money for 2x certs but the contractor wont want to etc etc.
To be honest this guy was being pretty rude on the phone saying i shouldn't be in the position to issue certs... when i don't think it is very clear. and i'm only trying to be safer rather than just issuing 10 years for everything.

Is there anyway it can be put on one install certificate?
 
If you go by the letter of the Law that is GN3...:)
If they are rented domestic properties, the max period between I&Ts is 5 years or change of occupancy.

Table 3.2 on page 65.
 
ah cheers forgot about this. however it says recommended. and also to the left it says the inspector can increase or decrease that of table 3.2 :S
 
so i have made a template for my Install certs after speaking to someone from nic.

in the extent of work box...


1. Rewire of Kitchen Ring, Cooker Circuit & Hallway Socket.
2. Renew CCU to 17th Edition Standard.
3. Upgrade to means of earthing/bonding.
4. Appliances, Central Heating Wiring and Controls is not Included in this Installation.
5. Length of Next Inspection Date is for the Entire Electrical Layout of the Property. Works Done Listed in this Box (Under this Installation Certificate) do not need to be Inspected for 10 years from the Date of this Certificate.
6. Existing Circuits (If Any) will be marked in page 3, Circuit Details & Test Results.
 
He says that if i have carried out a full test on the property ........

and did you ???
if the council instructed and paid your company to carry out a periodic inspection at the same time as the kitchen rewire then they have every right to expect 2 certs , both eic & eicr at no extra cost to themselves.
you need to get your administration systems sorted fast if youre in the public housing game instead if tinkering with form layouts.
 
I'm only a T&I Inspector for the company so unfortunately i am not involved in any decisions or meetings, so its pretty difficult for me. I'm just trying to do the best from what i know.

As far as i am aware from recent talks. The Council/Contractor wanted 10 years on the works done. Nothing has been mentioned about the rest of the property. I actually just test it in accord to duty of care, as we replace the CCU. The guy from NICEIC said i must only full fill my duty of care on the untouched circuits and mention on page 3 which circuits are original.
 
I'm only a T&I Inspector for the company so unfortunately i am not involved in any decisions or meetings, so its pretty difficult for me. I'm just trying to do the best from what i know.

As far as i am aware from recent talks. The Council/Contractor wanted 10 years on the works done. Nothing has been mentioned about the rest of the property. I actually just test it in accord to duty of care, as we replace the CCU. The guy from NICEIC said i must only full fill my duty of care on the untouched circuits and mention on page 3 which circuits are original.

You must have valid reasons for increasing (or decreasing for that matter) the re-test period and not on the say so of the persons ordering the works, you are the tester and it's what you feel is right for that installation after considering the circumstances.
 
This is exactly what i have been telling them. At the end of the day it is what the inspector deems safe and acceptable. However morales do not matter in the face of the contractors and councils, they want the maximum time allowed so they don't have to spend any money.

I just thought i would share my situation and see where people can help. I am trying to gather as much material to show these numptys i cannot issue 10 year certs for a property containing cable that i we have not touched and is probably 10-20 years old!
 
This is exactly what i have been telling them. At the end of the day it is what the inspector deems safe and acceptable. However morales do not matter in the face of the contractors and councils, they want the maximum time allowed so they don't have to spend any money.

I just thought i would share my situation and see where people can help. I am trying to gather as much material to show these numptys i cannot issue 10 year certs for a property containing cable that i we have not touched and is probably 10-20 years old!

Then there's not a problem as the maximum recommended time for that installation is 5 years!
 
Didnt you say that the CU has been changed ? item 2. Renew CCU to 17th Edition Standard. if so you should be testing the whole installation anyway then it would be one installation certificate with a note stating you are unable to check hidden wiring as part of the test.
 

Reply to HELP please with next inspection date in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
288
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
790
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
811

Similar threads

  • Question
No it is not implying it is safe, it is stating what the recommended date for the next inspection is. The next inspection date sticker doesn't...
Replies
10
Views
2K
davesparks
D

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top