Hi,
Hope all are well,
I just need clarification on a job Ive done with regards to the certification.
I have wired an extension to house which includes a bedroom, kitchen and bathroom. The old house is installed to 17th edition. The extension has a new DB that the extension circuits are supplied from but the new DB is a circuit supplied from the old DB Main side. Ive done an EICR on the old.
I have not finalised any certs yet, But have chosen to document like this.
1) EICR old house which was (17th edition compliant)
2) EIC extension DB as Addition with associated circuits
As new DB supply is a circuit from old board do I need a separate EIC just for that circuit?
I suggested a rewire of whole house as there was decent enough access to do so but client did not want to.
Any help would be greatly appreciated.
Thanks
Hope all are well,
I just need clarification on a job Ive done with regards to the certification.
I have wired an extension to house which includes a bedroom, kitchen and bathroom. The old house is installed to 17th edition. The extension has a new DB that the extension circuits are supplied from but the new DB is a circuit supplied from the old DB Main side. Ive done an EICR on the old.
I have not finalised any certs yet, But have chosen to document like this.
1) EICR old house which was (17th edition compliant)
2) EIC extension DB as Addition with associated circuits
As new DB supply is a circuit from old board do I need a separate EIC just for that circuit?
I suggested a rewire of whole house as there was decent enough access to do so but client did not want to.
Any help would be greatly appreciated.
Thanks