- Joined
- Oct 9, 2010
- Messages
- 4,532
- Reaction score
- 1,512
All enclosures of RCDs or consumer units incorporating RCDs in TT installations should have an all-insulated or class 2 construction, or additional precautions, as recommended by the manufacturer, need to be taken to prevent faults to earth on the supply side of the upstream 100mA, S type, RCD.
That's why we're suggesting a 'front end' RCD.