HELP with quote please. | Page 2 | on ElectriciansForums

Discuss HELP with quote please. in the UK Electrical Forum area at ElectriciansForums.net

Joined
Dec 5, 2018
Messages
15
Reaction score
31
Location
Dartford
Hi good morning.

I hope you are all well and have had a good Christmas .

I went to quote for a job today.

Its one large house that has been converted into 2 HMO properties.

Couple of questions that i need help with please. As i have never done any install work on a HMO before .

The builder had an electrician there before Christmas who has 1st fix both properties including a fire alarm system in each.
What certification do i neee to provide for the fire alarm system?

Is it something i can issue as a domestic installer with the NIC. Via my online certification website? Or do i need a registered fire alarm company to issue certification?
Do plans of the fire alarm system need to issued also?

Is there any other issue i need to think about with a HMO?

Does it need emergency lighting installed?

Many thanks Darren the electrician from volt-elect
 
How do you know that the first fix has been done correctly? If for some reason the No 2 hits the fan who will the authorities be coming after you or the first electrician?
Walk away from this is your best course of action. Never ever do a job like this and most certainly never do a job when you go in after somebody else on a price. It is in your best interests to tell them to go back to the original contractor. They could be trying to play you off against each other in order to get him to drop his price. NEVER EVER in circumstances like this believe what is being said to you, people can be very economical with the truth in these sort of cases.
 
Don't touch it fella......or check every cable run......every fixing......do a full test on every circuit first.......especially if it's been plastered......as most people have said on here..don't touch it.....sounds fishy
 
I've only done it once.

A quick look at it told me it was best to rip it out and start again.

Builder agreed with me hence asking me to look at it.

I've done all his work since then.

Normally though.. walking away is the preferred option.
Sorry that was meant to be a thumbs up......tried clicking it on my phone and hit the wrong one
 

Reply to HELP with quote please. in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
354
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
905
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
I've looked at the fire assessment from the last HMO I did for the same landlord and fire assessor, the risk assessment is pretty worthless, it's...
Replies
7
Views
1K
  • Question
Personally I won't do fixed price work unless there is a clear spec for the job including things like smokes, data, TV whatever else the customer...
Replies
3
Views
779

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top