Have my part p assessment on a PV install shortly, im being assessed on the pv install only but of course have to make sure the earthing, main bonding and supplementary bonding is adequate but not sure where i stand with regards supplementary bonding in the bathroom.

Bathroom - radiator, taps, shower (mixer) all supplied by pvc pipes.
- whirlpool motor under bath (not accessible so outside zones) has 30 mA rcd protection at socket outside of bathroom as well as 30mA rcd at CU
- SELV lighting circuit - no rcd protection as required (701.411.3.3) but this is not for me to correct, i would normally stick it
on an rcbo to make life easy but as i have stayed clear of the main CU and installed a dedicated 2-way for the PV circuit i
dont really want to be opening that can of worms (the existing installation is iffy to say the least)

The problem is, for supplementary bonding to be omitted (701.415.2) ALL final circuits must have additional protection by means of rcd, but i cant see why it would be required in this situation?.

No doubt i'm wrong on this one.

Any thoughts?
 
Last edited by a moderator:
Where is the requirement to check on supplementary bonding?

I agree with the earthing and main protective bonding but unless there is a specific requirement through MCS then supplementary bonding on the existing installation is not your concern.
 
if IQ is wrong on this, i'll be surprised. as he says, you should ensure main earthing and bonding is in place and adequate, but you are not responsible for the existing installation except as it affects your work.
 
Checked with ELECSA today and indeed you are correct, pretty obvious now i think about it as it is of course part of the existing installation. Will make a note of it on the Electrical Installation Certificate.

Thanks for the input
 

Reply to Help with supplementary bonding in the Australia area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
319
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
846
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
968

Similar threads

  • Question
Surely one of the most important parts of supplementary bonding is to bond the radiator and hot tap/pipe to the cold one. Both the hot tap and...
Replies
32
Views
2K
The power company only brings in 3 wires which is 2 live and 1 neutral wire. It’s our responsibility to add the ground rod to bond the neutral...
Replies
3
Views
611

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top