High level cabling with long life span | on ElectriciansForums

Discuss High level cabling with long life span in the UK Electrical Forum area at ElectriciansForums.net

Doomed

-
Arms
Joined
May 26, 2009
Messages
1,132
Reaction score
764
Location
Dorset
Replacing some lights on top of front elevation of really tall building, once in 25 years scaffolding job.
At present in MI, but due to roof works this will have to be stripped out.
The new lights are going to be 100W LED units.
The new roofing structure has ducting approx the size of MT3 built in to it and openings are to be made where the lights have to go.
What cable would you use?
Note: this is a marine enviroment
Note 2: I got to the top of the scaffolding and had to wimp out, much to the amusment of my work mates.
 
Replacing some lights on top of front elevation of really tall building, once in 25 years scaffolding job.
At present in MI, but due to roof works this will have to be stripped out.
The new lights are going to be 100W LED units.
The new roofing structure has ducting approx the size of MT3 built in to it and openings are to be made where the lights have to go.
What cable would you use?
Note: this is a marine enviroment
Note 2: I got to the top of the scaffolding and had to wimp out, much to the amusment of my work mates.
MI
 
Re do in MI is best, especially in marine environment. If not, swa.
If any of the cable is open to sunlight or water it could cause problems, so if someone recommends FP, tell 'em where to shove it.
 
How high is this scaffold?
Would you feel safer on a cherry picker?

Probable the equivalent of a six story building - yes I'm a wuss - I used to do rock climbing as well!
[ElectriciansForums.net] High level cabling with long life span

You can see the existing lights
 
Hi lads,

New member here but just wanted to add my thoughts,

If it's yt3 size trunking so kept hidden from direct sunlight and the elements would flat twin or hi tuff not be acceptable?

I've never done any marine work so dont the know if I'm talking absolute bo**oks

Yplan
 
One of my first jobs as an apprentice, 3 men, 3 lads on the job was at Leith Docks in Edinburgh, replacing floodlights on the roof.
Access was by a tower scaffold, as high as it could go, then a ladder from the platform onto the roof. Finally another stepladder on the roof, up a 6ft pole to mount the floodlight on top.
Don't tell H&S

This was before I developed shaky leg syndrome... I get that climbing a ladder nowadays.
 

Reply to High level cabling with long life span in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
430
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top