Hello everyone please help me with this homework which is too hard for me due to the fact my teacher didnt teach well so i have some problems with this schoolwork.
a distribution transformer station with a voltage on the low voltage side 3x400V and a short-circuit power on the low voltage side 95MVA is powered by an overhead power supply 4xAL 70mm2 (aluminum) with a length of 2.5 kilometers. this line is terminated with a switchgear, the component is a single-phase distribution board supplying the circuit of a residential installation with a length of 19 meters, made using aluminum YADYp 3x2.5 mm2. determine short-circuit conditions at the end of the overhead line and pass the expected current at the end of the residential installation configuration. short-circuit current exclusive meters for t = 20 ms and thermal equivalent current during the short circuit Tk = 40 ms
a distribution transformer station with a voltage on the low voltage side 3x400V and a short-circuit power on the low voltage side 95MVA is powered by an overhead power supply 4xAL 70mm2 (aluminum) with a length of 2.5 kilometers. this line is terminated with a switchgear, the component is a single-phase distribution board supplying the circuit of a residential installation with a length of 19 meters, made using aluminum YADYp 3x2.5 mm2. determine short-circuit conditions at the end of the overhead line and pass the expected current at the end of the residential installation configuration. short-circuit current exclusive meters for t = 20 ms and thermal equivalent current during the short circuit Tk = 40 ms